Qualification & validation

STERIGENE has developed a team of validation managers and technicians specialising in the development of protocols in accordance with applicable standards, and in qualification interventions for the process equipment on your production lines.​

Contact us

The manufacturer of process equipment must control the critical aspects of the operations they implement through a qualification and validation programme throughout the product and process lifecycle. Any planned change to facilities, equipment, utilities and processes that may affect product quality must be formally documented, and the impact on validation status or the control strategy must be assessed.

GMP Annex 15


To this end, STERIGENE has developed a team of validation managers and technicians specialising in the development of protocols in accordance with applicable standards, and in qualification interventions for the process equipment on your production lines.

Our qualification and validation offering

Qualifications & validations in accordance with applicable reference frameworks

  • Development of customised protocols
  • Teams of expert and specialist technicians
  • Secure static and dynamic testing
  • Equipment traceable to international standards
  • Summary report with recommendations

A comprehensive catalogue to cover all your needs

  • FAT (Factory Acceptance Test)
  • SAT (Site Acceptance Test)
  • (Re)Installation Qualification (IQ)
  • Instrumentation calibration (CAL)
  • (Re)Operational Qualification (OQ)
  • Steam profile qualification in accordance with EN 285
  • Performance Qualification (PQ)

For all your equipment across your production zones

  • Autoclaves
  • Washers
  • Steam generators, thermocompressors and distillers
  • Inspection tables / Automatic or semi-automatic inspection machines
  • Filling machines and packaging equipment
  • Isolators / Barrier systems (RABS)
  • Vessels​

Capitalisable FAT/SAT

With STERIGENE, tests compliant with the FAT (Factory Acceptance Test) can be capitalised for the SAT (Site Acceptance Test), and tests compliant with the SAT can be capitalised for the Installation and Operational Qualifications (IQ/OQ). This reduces process equipment downtime and therefore reduces your production stoppage costs.

Qualification of your controlled atmosphere zones & cleanrooms with STAURATEC

Our partner STAURATEC, part of the SYNEXIN Group, offers a comprehensive range of qualifications for controlled atmosphere zones:

  • Particle counts
  • Airflow measurements
  • Cleanroom integrity testing
  • Filter integrity testing
  • Airborne biocontamination
  • Airborne Surface Disinfection

More information